{ "currentVersion": 10.91, "cimVersion": "2.9.0", "serviceDescription": "

This service contains points, lines and polygons that are representative of Public Utility capital improvement projects throughout the city. The projects that are included in the service represent both water and sewer assets and covers rehabilitations, replacements, IDIQ and new assets. The projects are updated by Public Utility engineers and the information is sent to the GIS Analyst to update the layer in GIS. At a minimum the layer is updated on a monthly basis and a good effort is made to keep the data as accurate and precise.<\/SPAN><\/P>

Each of the layers includes at a minimum a project description, various time line fields and a general cost breakdown.<\/SPAN><\/P>

Layers Included: CIB Project Points, CIB Project Lines, CIB Project Areas<\/SPAN><\/P>

<\/P><\/DIV><\/DIV><\/DIV>", "mapName": "Capital Projects", "description": "This service contains points, lines and polygons that are representative of Public Utility capital improvement projects throughout the city. The projects that are included in the service represent both water and sewer assets and covers rehabilitations, replacements, IDIQ and new assets. The projects are updated by Public Utility engineers and the information is sent to the GIS Analyst to update the layer in GIS. At a minimum the layer is updated on a monthly basis and a good effort is made to keep the data as accurate and precise.Each of the layers includes at a minimum a project description, various time line fields and a general cost breakdown.Layers Included: CIB Project Points, CIB Project Lines, CIB Project Areas", "copyrightText": "Public Utilities", "supportsDynamicLayers": true, "layers": [ { "id": 1, "name": "CIB Project Points", "parentLayerId": -1, "defaultVisibility": true, "subLayerIds": null, "minScale": 0, "maxScale": 0, "type": "Feature Layer", "geometryType": "esriGeometryPoint", "supportsDynamicLegends": true }, { "id": 0, "name": "CIB Project Lines", "parentLayerId": -1, "defaultVisibility": true, "subLayerIds": null, "minScale": 0, "maxScale": 0, "type": "Feature Layer", "geometryType": "esriGeometryPolyline", "supportsDynamicLegends": true }, { "id": 2, "name": "CIB Project Areas", "parentLayerId": -1, "defaultVisibility": true, "subLayerIds": null, "minScale": 0, "maxScale": 0, "type": "Feature Layer", "geometryType": "esriGeometryPolygon", "supportsDynamicLegends": true } ], "tables": [], "spatialReference": { "wkid": 102747, "latestWkid": 2284, "xyTolerance": 0.003280833333333333, "zTolerance": 0.001, "mTolerance": 0.001, "falseX": -111140600, "falseY": -91532100, "xyUnits": 3048.0060960121928, "falseZ": -100000, "zUnits": 10000, "falseM": -100000, "mUnits": 10000 }, "singleFusedMapCache": false, "initialExtent": { "xmin": 1.1989702134320384E7, "ymin": 3354749.452772534, "xmax": 1.2238635937235998E7, "ymax": 3506433.290731603, "spatialReference": { "wkid": 102747, "latestWkid": 2284, "xyTolerance": 0.003280833333333333, "zTolerance": 0.001, "mTolerance": 0.001, "falseX": -111140600, "falseY": -91532100, "xyUnits": 3048.0060960121928, "falseZ": -100000, "zUnits": 10000, "falseM": -100000, "mUnits": 10000 } }, "fullExtent": { "xmin": 1.2043317503719568E7, "ymin": 3374074.9343177974, "xmax": 1.2179015645708561E7, "ymax": 3481479.9386674613, "spatialReference": { "wkid": 102747, "latestWkid": 2284, "xyTolerance": 0.003280833333333333, "zTolerance": 0.001, "mTolerance": 0.001, "falseX": -111140600, "falseY": -91532100, "xyUnits": 3048.0060960121928, "falseZ": -100000, "zUnits": 10000, "falseM": -100000, "mUnits": 10000 } }, "datesInUnknownTimezone": false, "minScale": 0, "maxScale": 0, "units": "esriFeet", "supportedImageFormatTypes": "PNG32,PNG24,PNG,JPG,DIB,TIFF,EMF,PS,PDF,GIF,SVG,SVGZ,BMP", "documentInfo": { "Title": "Capital_Projects", "Author": "", "Comments": "This service contains points, lines and polygons that are representative of Public Utility capital improvement projects throughout the city. The projects that are included in the service represent both water and sewer assets and covers rehabilitations, replacements, IDIQ and new assets. The projects are updated by Public Utility engineers and the information is sent to the GIS Analyst to update the layer in GIS. At a minimum the layer is updated on a monthly basis and a good effort is made to keep the data as accurate and precise.Each of the layers includes at a minimum a project description, various time line fields and a general cost breakdown.Layers Included: CIB Project Points, CIB Project Lines, CIB Project Areas", "Subject": "This service contain points, lines and polygons that are representative of Public Utility capital improvement projects throughout the city.", "Category": "", "AntialiasingMode": "None", "TextAntialiasingMode": "Force", "Version": "2.9.0", "Keywords": "Chesapeake VA,Water,Sewer,Public Utilities,Capital Improvement,Project" }, "supportsQueryDomains": true, "capabilities": "Query,Map,Data", "supportedQueryFormats": "JSON, geoJSON, PBF", "exportTilesAllowed": false, "referenceScale": 0.0, "supportsDatumTransformation": true, "floorAwareMapProperties": { "defaultFloorFilterSettings": {"isEnabled": true} }, "archivingInfo": {"supportsHistoricMoment": false}, "supportsClipping": true, "supportsSpatialFilter": true, "supportsTimeRelation": true, "supportsQueryDataElements": true, "maxRecordCount": 2000, "maxImageHeight": 4096, "maxImageWidth": 4096, "supportedExtensions": "", "serviceItemId": "c9b8ce1f842547d5bcabb920bc799fb3" }